Milestones

Key dates and their status.

One row per item, the plainest possible view.

Due against hit, side by side. Eleven days late on designs is a fact, not a feeling.
  • Contract signed14 Jul
  • Designs approved8 Aug
  • Build complete30 Sep
  • Handover14 Oct

What it does

Behaviours, not fields. Choosing between two modules is choosing between these.

Due against hit, side by side, so being eleven days late is a fact rather than a feeling.

A milestone is a fact about the project, not a piece of work — which is why there are five and not fifty.

Answers are we on track without anyone assembling a status report.

How it works

  1. 1

    A handful of milestones are agreed at the start, usually five or fewer.

  2. 2

    Hit is set when the thing happens, and the gap against Due is computed rather than judged.

  3. 3

    The agent answers are we on track from the two columns without anyone assembling a report.

  4. 4

    A missed milestone stays on the list with its real date, which is what makes the record useful later.

Best for

Reading and scanning. It is the right default more often than it looks.

Not the right choice for

Comparing many fields at once — use a table.

What a row holds

Every field, and what the agent listens for to fill it — which is the difference between a page you type into and one that fills itself.

FieldTypeFilled from
MilestonerequiredtextThe moment that marks progress. A fact about the project, not a task.
DuerequireddateWhen it should happen.
HitrequiredtextThe date it actually happened, or Not yet. Both are answers.

What it does not do

A module chosen for something it cannot do costs more than one that was never offered.

  • Not a task list. If there are twenty, they are tasks and the wrong module is in use.
  • No dependencies — a milestone is an outcome, not a step.
  • Nothing recalculates the later dates when an early one slips; that is a Gantt chart.
  • Slippage is visible per milestone but not summarised across a portfolio.

Before it works

What you have to provide, if anything.

  • Nothing.
  • Agree the milestones before the work starts. Adding them afterwards produces a list that was always going to be met.

In practice

An agency reporting stages to a client every fortnight.

Designs were approved on the nineteenth.
What was said to the agent

What the agent built

The milestone marked hit, against a due date of the eighth.

What changed

The eleven-day slip was in the next report automatically. The conversation about the end date happened in August instead of October.

Questions

What data does the Milestones page use?

It reads milestone records the agent has collected. Key dates and their status. Nothing has to be imported first — the page appears once there is something to show.

Do I have to build or configure it?

No. You describe what you need in a sentence and the agent chooses the view and fills it. Custom pages exist for the cases no built-in view covers, and those are reviewed before they go live.

When is a list the wrong choice?

Comparing many fields at once — use a table. It is best for: reading and scanning. It is the right default more often than it looks.

Does it stay up to date?

Yes. The page is a view over the data rather than a copy of it, so anything the agent learns afterwards shows up without a rebuild or a re-import.

Ask for it in a sentence

You do not configure this page. You tell your agent what you need and it builds it from what it has already collected.

Build your agent free